Estimated Loss
$2.0B
Ground-up structural loss (Mode 1)
$48.6B total RCV in bbox
Color Mode
Zone Legend
Z1Core (interior)
Z2Transition (0–150m)
Z3Ember cast (downwind)
Z4Fringe (500m–1.5km)
Zone Summary
| Zone | Structs | Est. Loss |
|---|---|---|
| Z1 | 3,141 | $1,417M |
| Z2 | 1,390 | $191M |
| Z3 | 1,427 | $70M |
| Z4 | 11,351 | $129M |
Layers
Perimeter: NIFC GeoMAC (final, 36,808 ac)
Structures: Hummingbird SI (CA)
Zones: geometric distance from perimeter
DR: pre-calibration fixed values
Structures: Hummingbird SI (CA)
Zones: geometric distance from perimeter
DR: pre-calibration fixed values